ETERNITY 26 Manuel de l'opérateur Page 19

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 35
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 18
Condensate Drain Installation
VERTICAL TERMINATION
HORIZONTAL TERMINATION
CONDENSATE DRAIN REQUIREMENTS
WARNING
! !
If the condensate collector is not used, the drain
pipe must be capped to prevent exhaust gases
and condensate from entering the building. The
Drain Cap is supplied on the appliance.
The condensate collector must be used in horizontal
teminations if a vertical rise in the vent system exceeds
5ft.
Regions of cold climate will create more condensate in
the vent system. The condensate collector should be
used in cold climates.
If more than one elbow is used in the vertical section
the condensate collector must be used.
19
All vertical terminating vent installations.
Horizontal terminating vent installations if a vertical rise in the vent system exceeds 5 ft. If more than one elbow is
used in the vertical section, a condensate collector must be used.
The Exhaust Collar of this water heater has a built-in condensate collector. Use 1/2" ID vinyl tube to connect
condensate drain port. Do not use copper piping for any portion of the condensate drain.
The condensate trap must contain a minimum of 3 inches of water.
Dispose of condensate per local codes.
Condensate formation can occur in high efficiency power vent appliances. To prevent condensate damage, a conden-
sate drain must be installed under the following conditions:
When the condensate collector is used, please follow these instructions.
Horizontal Termination Without Using The Condensate Collector
Vue de la page 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 34 35

Commentaires sur ces manuels

Pas de commentaire